# PlugRail Japanese Calendar (dev.plugrail/jp-calendar): tool descriptions scored

- tools/list taken: 2026-11-02 (UTC)
- From: [Official MCP Registry](https://registry.modelcontextprotocol.io/v0/servers/dev.plugrail%2Fjp-calendar/versions/latest)
- Connected to: https://jp-calendar.plugrail.dev/mcp
- Homepage: https://plugrail.dev/
- Repository: https://github.com/plugrail/servers
- Scoring rules: v2
- Tools: 4
- Average: 40.0 / 100 (Cloudy)
- Near-identical pairs: 0

This page shows how PlugRail Japanese Calendar (dev.plugrail/jp-calendar)'s tool descriptions scored, the issues found and the names of its tools and parameters. The descriptions are the server's own: read them where the copy came from.

Forecall asked the URL this server lists in the official MCP Registry for its tools/list once, on the date above, without calling any tool. The server may have changed since.

## Across the server

- Minor: The server has no instructions. Say there, once, what the server is for and when to use it: Claude Code and Gemini CLI read the instructions before the tool descriptions.

## Tools

- `list_holidays`: 35 / 100
  - Major: The description is too short (3 words).
  - Major: Says nothing about when to use it, or when not to.
  - Minor: String arguments with no constraint or example: from, to.
  - Minor: No `required` list, so every argument is optional.
  - Minor: Says nothing about what it returns.
  - Minor: No constraints, side effects, auth or rate limits described, and no annotations.
- `is_holiday`: 38 / 100
  - Major: The description is too short (1 word).
  - Major: Says nothing about when to use it, or when not to.
  - Minor: String arguments with no constraint or example: date.
  - Minor: Says nothing about what it returns.
  - Minor: No constraints, side effects, auth or rate limits described, and no annotations.
- `add_business_days`: 42 / 100
  - Major: Says nothing about when to use it, or when not to.
  - Minor: String arguments with no constraint or example: date, calendar.
  - Minor: Says nothing about what it returns.
  - Minor: No constraints, side effects, auth or rate limits described, and no annotations.
- `business_days_between`: 45 / 100
  - Major: Says nothing about when to use it, or when not to.
  - Minor: String arguments with no constraint or example: from, to, calendar.
  - Minor: The meaning of the boolean argument include_from is unclear.
  - Minor: The meaning of the boolean argument include_to is unclear.
  - Minor: Says nothing about what it returns.
  - Minor: No constraints, side effects, auth or rate limits described, and no annotations.

Is your server listed here and you would rather it were not? Email support@forecall.dev, and we will take it off within 7 days.

[All scored servers](https://forecall.dev/en/servers)
